About Us
Streamlined Support for Every Stakeholder in Division 8 & 10
General Contractors (GCs)
Division 8 & 10 Solutions – From Specification to Final Installation
General Contractors trust Aorbis as a reliable extension of their project team. Instead of juggling multiple vendors, GCs work with us to simplify the entire workflow for doors, frames, hardware, bathroom accessories, and Division 10 specialties.
What We Deliver:
- One vendor for all Division 8 & 10 products
- Accurate take-offs & specification matching
- Turnkey installation & code compliance
- Faster timelines with fewer coordination issues
- Proactive communication & field support
Aorbis becomes part of your supply chain – reducing delays, RFIs, and costly mistakes.
Architects & Specifiers
Where Design Intent Meets Code-Compliant Execution
Architects influence every detail of Division 8 & 10 – from product style to fire ratings, ADA compliance, and specialty hardware. We support your design vision with technical accuracy and real-world constructability.
How Aorbis Supports Architects:
- Division 8 & 10 specification alignment
- Expert consultation for fire-rated & security openings
- Custom fabrication options
- Hardware & specialty product coordination
- Submittals that reduce RFIs and prevent clashes
We ensure what’s drawn can be installed – correctly and compliantly.
Facility Owners, Operators & Developers
Secure, Durable & Cost-Efficient Building Solutions
Owners and developers define the budget, the performance expectations, and the long-term value of every project. Aorbis helps you build secure, functional, and future-ready environments.
What We Provide:
- Smart access control systems & keyless entry
- Tenant-friendly security solutions
- Durable doors, hardware & Division 10 items
- Preventative maintenance & safety upgrades
- Cost-conscious material recommendations
We help protect your investment – from handover to long-term operations
Manufacturers & Brand Partners
Trusted Products Backed by Trusted Partnerships
- Clear, accurate orders
- Correct product pairings (especially hardware + door prep)
- Lead time alignment
- Reduced back-and-forth communication
Subcontractors & Installers
Field-Ready Products Installed Right the First Time
Division 8 & 10 installation is detailed work — from door alignment and hardware prep to restroom partitions, lockers, and specialty items.
Aorbis Supports Installers With:
- Pre-hung / pre-mounted door & hardware options
- Clear installation drawings
- Sequenced delivery (not chaotic bulk drop)
- Coordination with access control trades
- On-site problem-solving when conditions change
When installers succeed, the whole project stays on schedule.
Why This Ecosystem Matters
Better Coordination = Fewer Delays, Fewer RFIs, Fewer Change Orders
Division 8 & 10 represent some of the most used, most visible, and most safety-critical elements in any building.
When they’re coordinated early and executed correctly, projects benefit from:
- Faster timelines
- Lower overall costs
- Safer public environments
- Better aesthetics & functionality
- Long-term operational reliability
Aorbis ensures every stakeholder gets what they need — without the typical friction that slows down construction.
Ready to Build With a Partner Who Aligns All Stakeholders?
Aorbis simplifies Division 8 & 10 from design to installation.